Construction engineering is a set of measures aimed at controlling the construction of buildings. Its main purpose is to establish links between individual performers for the commissioning of the facility under construction. Can any company take responsibility for such forms of project management? The answer is simple: "No!"
Despite the external simplicity, construction management is a very time-consuming and complex process, which consists of several stages:
- development of a cost management system;
- preparation of project documentation;
- work with permits, technical conditions;
- selection of contractors and search for independent experts.
Each of these stages has its pitfalls, without the knowledge of which it is extremely difficult to make the right choice. That is why construction management is one of the most responsible jobs. There are several approaches to project management in construction, namely:
- work through a general contractor;
- with the help of a construction manager;
- using the services of a management company.
BIM methods successfully ensure the organization, planning and management of construction https://constructible.trimble.com/construction-industry/what-is-bim-building-information-modeling, reducing construction time, reducing their cost, reducing the volume of construction in progress and eliminating losses.
What is included in the project of organization of works:
In most cases, work on the construction, repair or dismantling of buildings for various purposes are highly complex. Despite all, our team's engineering consultancy https://karnoenergy.com/building-services-engineering/ use special machinery, equipment and tools. The project of the organization of works of PIR should contain all executive documentation and schemes of the equipment which use will make performance of works more effective.
As a rule, the plan of the organization of works contains the exhaustive information from the following installations and the equipment:
- Mechanisms designed for cementation, clay and thermal strengthening of the soil at the site.
- Drawings of scaffolding and installations for installation and dismantling.
- Fences for are in the immediate vicinity of the object of trenches and ditches.
- Places for overloading in the construction area.
- Modules for drying walls with charge compensation.
- Designs designed to maintain the stability of the walls.
- Mechanisms for the organization of underground pipelines by pushing the soil.
The project of the organization of works is necessarily coordinated with the customer, the general contractor and subcontractors.
Consistent design of R&D and strict implementation of the plan is a guarantee of quality implementation. As a rule, the implementation of measures in accordance with the project works allows to reduce the cost of its implementation and avoid a large number of customer complaints. At the previous stage it is possible to calculate almost all the nuances and minimize risks and losses during the work.