Sunny Moon – Eco-Premium Complex in the South of Phuket, Nai Harn
A modern residential complex located in one of the most attractive areas of southern Phuket, just about 800 meters from Nai Harn Beach.
The location combines proximity to nature, a peaceful atmosphere, and well-developed tourist and recreational infrastructure. The complex is designed with an eco-premium concept, where architecture harmoniously blends with tropical для nature. Lush greenery, natural materials, and relaxing spaces create the feeling of a private resort.
The project is being developed in two phases:
- Two residential buildings with full complex infrastructure
- Planned completion and handover: September 2026
• prices from 5,300,000 THB (~143,000 EUR)
• prices from 8,100,000 THB (~219,000 EUR)
• prices from approximately 12.500.000 THB 339.000€
Phase 2 – Building 3 (Premium Segment)
- A private, boutique-style building
- Only 68 apartments, offering more privacy and a club-like character
- Planned completion: approximately 1.5 years after Phase 1, around Q1 2028
The project stands out for high-quality materials and modern technological solutions.
Materials and features include:
- Natural materials – wood, stone, and textiles
- Furniture and decorative elements in teak wood
- Gorenje appliances
- Smart Home system
- Additional water purification system
Lush greenery, gardens, and relaxation areas make the complex fit perfectly into the natural landscape of southern Phuket.
Residents have access to a resort-style infrastructure:
- Sea-water swimming pools
- Rooftop panoramic bar
- Outdoor cinema
- Fitness center
- Coworking area
- Recording studio
- SPA
- Sauna and hammam
- Ayurvedic center
- Yoga studio
- Meditation garden
- Kids club and children’s room
- PlayStation Room
- VR space
The complex is close to many attractions in southern Phuket:
- Promthep Cape viewpoint
- Ya Nui Beach and Rawai Beach
- Robinson Lifestyle Chalong shopping center
- International schools
- Phunaka Golf Driving Range
The combination of beach proximity, peaceful atmosphere, and developed infrastructure makes the location attractive for both living and investment.
- EIA permit obtained
- Construction in progress
- Phase 1 completion: September 2026
- Phase 2 completion: approximately Q1 2028